Land and zoning checks in Bali

Before leasing or buying land in Bali you need to know whether the zoning allows your intended use. Zoning is set by the provincial spatial plan (RTRW) and the regency's detailed plan (RDTR), and is confirmed through a spatial suitability approval (KKPR). Since 2025 Bali has prohibited converting protected agricultural land (LP2B) and restricted converting productive land for villas and hotels. ICM checks the zoning, protection status, setbacks and access before you sign.

Who this is forInvestors and developers assessing a plot of land in Bali
JurisdictionProvince of Bali and its regencies (Badung, Gianyar, Tabanan and others)
AuthorAlessandro Stagno, Founder & President Director (Direktur Utama), Indonesia Core Management
Updated
01Scope

How zoning is set in Bali

01

Provincial spatial plan (RTRW)

Bali’s current plan is Regional Regulation 2 of 2023, covering 2023–2043.

02

Regency detailed plans (RDTR)

Each regency sets zone codes plot by plot where an RDTR exists: residential, tourism, trade, agricultural, green open space and others.

03

Spatial suitability approval (KKPR)

The first of the basic approvals required before a building permit. It confirms that the planned activity fits the zone.

The certificate of the land does not tell you the zoning. A plot with a clean freehold title can still sit in a zone where a villa business is not allowed.

02Scope

Protected and productive land

01

LP2B and standard rice fields

A Governor’s instruction issued in December 2025 prohibits converting protected agricultural land (LP2B) and standard rice-field areas (LBS).

02

Moratorium on productive land (September 2025)

After the September 2025 floods the Governor announced that productive land may no longer be converted for hotels, villas and restaurants, with attention on the Ayung watershed across Denpasar, Badung, Gianyar and Tabanan.

03

Regional Regulation 4 of 2026

Regulates the control of productive-land conversion in Bali and prohibits nominee (“pinjam nama”) control of land. Sanctions include stopping activities, closure, revocation of permits and demolition.

These rules are recent and implementation is still evolving. We check the current position for each plot rather than rely on general statements.

03Scope

Setbacks and other constraints

01

Coastal setback

At least 100 metres from the highest tide line under national regulation, subject to local plans.

02

River and ravine setbacks

And slope limits, particularly relevant in Ubud and inland Tabanan.

03

Building height and coverage ratios

Set by the zone.

04

Temple and sacred-area rules

That can affect building height and use near temples.

05

Access

Legal road frontage or a registered right of way.

04Process

What ICM checks

01

Zone code of the plot in the applicable RDTR or spatial plan, and whether your intended use is permitted.

02

Whether the plot is LP2B, standard rice field or productive land affected by the current restrictions.

03

Setbacks, coverage and height limits that change the buildable area.

04

Legal access and utilities (electricity, water, drainage).

05

Whether a KKPR can realistically be obtained for the planned activity.

The result is a short written report with a clear answer: suitable, suitable with conditions, or not suitable for your plan.

Related: property due diligence · building permits PBG and SLF

05Questions

Frequently
asked.

Do not plan on it. Changes to spatial plans follow public planning processes, and since 2025 Bali has moved to restrict conversion of productive and agricultural land rather than open it. Base the decision on the zoning that applies today.

LP2B (Lahan Pertanian Pangan Berkelanjutan) is land designated for sustainable food agriculture. In Bali a 2025 Governor's instruction prohibits converting LP2B and standard rice-field areas to other uses.

Green-belt and protected areas generally do not allow the residential or tourism development investors plan. The exact rules depend on the regency plan and the zone code, which is why we check the specific plot.

Land or property identified

Request due-diligence support

Send us the location and whatever documents you have. We tell you what needs to be verified before you sign or pay a deposit.

Request due diligence ↗